Starting work in the Glynn Valley on the A38 in January to undertake an earthworks scheme was a challenging prospect but the scheme was delivered on budget and ahead of time.
-
The works required a 560m length of existing masonry wall to be replaced and strengthened.
- Bulk Earthworks & fill
- Japanese Knotweed Removal
- New Zealand Pigmy Weed Removal
- Working around water
- Gabion Retaining Walls
- Earth Retaining Walls
- Drainage
- Sub-base
- Kerbing
- Sign Erection
-
Our scope of works included:
-
The value of the scheme was just over £1m.
Client:
Kier
Location:
A38 Lower Lodge, Cornwall